Passer aux informations produits
1 de 5

Kids GPS Smartwatch with Video Calling and Real-Time Location Tracking for Parents, Emergency SOS Button, 13 MP Camera, Activity Tracker

Kids GPS Smartwatch with Video Calling and Real-Time Location Tracking for Parents, Emergency SOS Button, 13 MP Camera, Activity Tracker

Prix habituel €40,95 EUR
Prix habituel Prix promotionnel €40,95 EUR
En vente Épuisé
Taxes incluses. Frais d'expédition calculés à l'étape de paiement.
Color

En stock

🇺🇸
Free US Shipping Delivered in 2–5 Business Days
USPS USPS

Stay Connected While They Explore Safely

This child's GPS smartwatch puts parental peace of mind on their wrist. Built-in real-time location tracking shows you exactly where they are at any moment through a parent-controlled smartphone app. Video calling over 4G cellular lets you check in face-to-face, while the one-touch emergency button instantly alerts you with their location and ambient audio. An approved contact list ensures only trusted family and friends can reach them. The 13-megapixel camera, step counter, and messaging features make it fun to wear every day, encouraging healthy activity while keeping communication open. Lightweight and splash-resistant, it's designed for active children who crave independence—and parents who need reassurance. Compatible with both iOS and Android, this smartwatch requires a 4G nano-SIM (sold separately) to unlock calling, video chat, and live GPS updates. Real-time GPS tracking shows location history and current whereabouts. Video calling over 4G connects parent and child anytime, anywhere. The emergency SOS button sends instant alerts with location data and a brief audio clip. A parent-managed contact list blocks unknown callers and messages.

Why You Need This

  • Live Location Updates: Geofencing alerts notify you when your child enters or leaves designated safe zones, like school or home.
  • Emergency Button Peace of Mind: One press delivers your child's exact coordinates and surrounding sounds straight to your phone.
  • Safe Communication Only: Pre-approved contacts mean no strangers can call or text—your child talks only to family and friends you trust.
  • Video Calls on the Go: See and hear your child through the built-in 13 MP camera, even when they're out playing or at a friend's house.
  • Encourages Active Play: The built-in step counter and activity tracker motivate daily movement and healthy routines.
  • Simple Setup, Full Control: The companion parent app (iOS and Android) lets you manage contacts, set safe zones, and review location history in seconds.

Built for Real Childhood Adventures

Crafted from lightweight ABS plastic with a soft silicone strap, this smartwatch feels comfortable all day long. The 1.83-inch color touchscreen is easy for small fingers to navigate, while IPX5 splash resistance handles rain, handwashing, and accidental spills. The rechargeable 450 mAh battery provides hours of talk time and standby on a single charge. Setup is straightforward: insert a compatible 4G nano-SIM (not included), download the parent app, and add your trusted contacts. From there, you control everything—who can call, where safe zones begin and end, and when to check in. Your child gains freedom, confidence, and a sense of responsibility, while you stay just a tap away. Ships with the smartwatch, USB charging cable, and an easy-to-follow instruction manual. Free US shipping and a 30-day return policy make trying it risk-free.

Informations sur l'expédition

Notre délai de livraison est de 2 à 5 jours ouvrables et notre délai de traitement est de 1 à 2 jours ouvrables. Vous recevrez une confirmation de livraison lorsque votre commande aura été expédiée de notre entrepôt. Vous recevrez ensuite un numéro de suivi et un lien pour suivre votre envoi.

Remboursements

Nous avons une politique de retour de 30 jours, ce qui signifie que vous avez 30 jours après réception de votre article pour demander un retour.

Afficher tous les détails