
love and recommend Ortekor
Ortekor Pet Tracker Series | GPS Cat Collar with Real-Time Location Updates | Lightweight Design for Cat Safety
Ortekor Pet Tracker Series | GPS Cat Collar with Real-Time Location Updates | Lightweight Design for Cat Safety
En stock
Impossible de charger la disponibilité du service de retrait
USPS
GPS Cat Collar for Real-Time Location Monitoring
The Pet Tracker is designed to provide peace of mind for pet owners by allowing real-time monitoring of your cat’s location. With its compact and lightweight design, it ensures comfortable wear while delivering reliable GPS tracking updates directly to your smartphone.
Key Features
- Real-Time Tracking: Provides instant location updates via smartphone
- Lightweight Design: Comfortable and unobtrusive for daily pet wear
- Accurate Location Data: Helps monitor and protect your pet effectively
- Easy Setup: Quick installation and simple app connection
- Rechargeable Battery: Long-lasting power for continuous tracking

Specifications
- Material: Durable ABS housing
- Dimensions: 2 cm × 2 cm compact design
- Battery: Long-lasting rechargeable battery
- Connectivity: GPS-enabled real-time tracking system
- Use Case: Designed for cat safety and outdoor monitoring
Informations sur l'expédition
Informations sur l'expédition
Notre délai de livraison est de 2 à 5 jours ouvrables et notre délai de traitement est de 1 à 2 jours ouvrables. Vous recevrez une confirmation de livraison lorsque votre commande aura été expédiée de notre entrepôt. Vous recevrez ensuite un numéro de suivi et un lien pour suivre votre envoi.
Remboursements
Remboursements
Nous avons une politique de retour de 30 jours, ce qui signifie que vous avez 30 jours après réception de votre article pour demander un retour.
