Passer aux informations produits
1 de 10

Ortekor SecureTrack | GPS Tracker for Seniors with Waterproof Design & Real-Time Location Updates | Lightweight Device for Safety

Ortekor SecureTrack | GPS Tracker for Seniors with Waterproof Design & Real-Time Location Updates | Lightweight Device for Safety

Prix habituel €50,95 EUR
Prix habituel Prix promotionnel €50,95 EUR
En vente Épuisé
Taxes incluses. Frais d'expédition calculés à l'étape de paiement.

En stock

🇺🇸
Free US Shipping Delivered in 2–5 Business Days
USPS USPS

GPS Tracker for Seniors with Real-Time Location Updates

SecureTrack is a discreet and lightweight GPS tracker designed specifically for seniors, ensuring their safety and independence. Weighing only 10g, this device easily attaches to clothing, bags, or keys and works seamlessly with the Find My app on iOS, providing precise real-time location updates without ongoing fees.

Key Features

  • Real-time tracking: Benefit from up-to-the-second location updates via the Find My network.
  • No ongoing fees: Enjoy a one-time purchase with no monthly subscription costs.
  • Global coverage: Ideal for everyday travel or visits abroad, ensuring safety wherever you go.
  • Lightweight design: At just 10g, it blends seamlessly into daily life without drawing attention.
  • Extended battery life: Operates for up to 12 months on a single CR2032 coin cell battery.
  • Waterproof and durable: With an IP67 rating, it withstands daily activities and splashes.
  • Safe zones and alerts: Receive notifications if a senior leaves designated safe areas.
  • Easy for seniors: The tracker is passive, with caregivers managing updates via the Find My app.

Specifications

  • Compatibility: iOS and Find My app
  • Battery: CR2032 coin cell (200mAh), up to 12 months per battery
  • Weight: 10g
  • Waterproof rating: IP67
  • Functions: Real-time GPS tracking, safe zone alerts, anti-loss tracking
  • Material: Protective case with keychain or strap

Informations sur l'expédition

Notre délai de livraison est de 2 à 5 jours ouvrables et notre délai de traitement est de 1 à 2 jours ouvrables. Vous recevrez une confirmation de livraison lorsque votre commande aura été expédiée de notre entrepôt. Vous recevrez ensuite un numéro de suivi et un lien pour suivre votre envoi.

Remboursements

Nous avons une politique de retour de 30 jours, ce qui signifie que vous avez 30 jours après réception de votre article pour demander un retour.

Afficher tous les détails